Between Building and Drawing
– Michael Becker and Duncan Blackmore
I
Making surveys of existing buildings is tricky. It is hard to know where to start and even harder to know when to stop. You have to know, before you get out there, pencil between your teeth, halfway up a ladder, squinting at your tape measure, what you’re really after. It is far more pleasant to sketch from a picturesque distance or blink into one of those yellow tripods than to be pressed up against a building and all of its stuff. When, measure in hand, crouched on the ground or peering over a parapet, the building tends to literally rub off on you. Like a stretch of coastline, there is no end to the ridges and bumps you find once you start looking. And then, it is dark before you know it, and you have to come back for the rest another time.

Back at the drawing board, trying to put it all back together, you inevitably discover some essential measurement which you have managed to miss. The perpetual incompleteness is maddening, but you have to make do with poor fidelity and just press on. It may seem strange then, given the immediacy with which the building was surveyed, that these drawings shown here appear in the manner that they do: dryly drawn with precise pencil point. And although I have described them as survey drawings, that is not quite right. Surveys are conventionally made before building works start, whereas these drawings are intended as a set of ‘as-built’ drawings, of the sort made when a new building is finished. So, despite resembling conventional surveys in method, the drawings are closer in their function to ‘as-builts’ typically produced on completion of a project. To further complicate matters, these drawings belong, in fact, to a peculiar third category, somewhere in-between. Rooted in a reluctance to produce a complete description of the building, or to permit its image to be consumed from a distance, the building was surveyed and drawn up neither before nor after, but at intervals during its construction.

II
The building is called Oficina, and it is home to Duncan’s creative practice, Arrant Industries. Nestled within an impossibly shaped plot and accessible only through the shopfront of a high-street hairdresser, Oficina might best be described as a building made without drawings. Instead of following a predetermined set of drawings, Duncan chose to make decisions as the project progressed. Building this way allowed the design to develop through its various contingencies, rather than simply having to accommodate them. Given the opportunity to supervise the works in person, and with trusted tradespeople available, it was possible to continually reassess the building’s evolving and aggregated character. Ideas that might otherwise have been precluded by contractual obligation could be tested, and found materials could be incorporated along the way.

Chance, improvisation, and error were all present in shaping the decisions being made on site. However, it must be noted that the unusual circumstances of Oficina’s construction rest solidly on an ethical and conceptual position that Duncan has developed over time through a constellation of different projects. This position has, in turn, allowed forces usually considered verboten within construction to become productive influences. It is only within a framework sufficiently stable to absorb the changing realities of the building site that this dance of chance, improvisation and error becomes permissible, and indeed possible. Yet to describe Oficina as a building without drawings is not quite accurate. Duncan collaborated with architects Sanchez Benton, and drawings were produced to negotiate the planning and building control processes. Only one of those drawings, however, was ever shown to the construction team on site.[1] Rather, evidence of the Oficina’s development accumulated in Duncan’s stack of sketchbooks or was drawn directly onto its timber offcuts and pink plasterboard.
I came into contact with the project through a series of open visits to the building site in the summer of 2025. Called ‘Preaching Tolerance’, these visits were conceived by Duncan to provide students with access to a building site where methods, decisions and compromises were visible and open to change. In a way, both the visits and eventually the drawings became a part of the project too.[2] They all emerge from a belief in direct experience and an interest in the conditions under which contingency might become productive. Soon after the visits, Duncan proposed producing a set of as-built drawings attuned to the peculiarities of the project and its processes. For more than a year, I went out to site, pencil in teeth, halfway up a ladder, and so on. Later, at a large drafting table, I wrestled with the poor and piecemeal surveys I had brought home. Slowly, as I chewed them over, the futility of producing a conventional set of as-built drawings of a building changing daily, began to dawn.
III
Conventional as-built drawings tend to be based on the drawings issued for construction. In a sense, they describe the building as it was when completed; in another, they work to conceal the circumstances and contingencies of its making. Often, the glut of detail drawings, quantities and certificates required before construction begins to serve as a substitute for trust between the parties involved. Client, builder and architect, linked together by these documents, climb into their fragile contraption and make their way to the building site. Once on site, all parties must work to ensure that things proceed as forecast. Deviations beyond certain tolerances stress the joints of their delicate mechanism and risk permanent deformation. Trust becomes strained, faith is tested, creditors baulk, builders bail and clients crumple. If a building, to borrow from Francesca Hughes, like a cell bound within its strictly pre-determined genetic material, falls victim to unforeseen contingencies, as is invariably the case, the construction site quickly mutates from a mess of giddy genesis to a difficult and deeply contested territory; a place of risk, suspicion and material promiscuity.[3] And finally, when it’s all over, the ‘as-built’ drawing dusts itself off, emerges precise and unblemished, bearing no trace of the strife or struggle of its making. How, then, should one record a building (built) without drawings? Particularly when the conditions of its construction are of a different order entirely?

Whilst surveying the site, I noticed that a kind of filtering took place. Given the impossibility of measuring everything, discrimination was essential. My attention would drift toward moments of perceived intensity. Often, Duncan would explain the origins of these moments. Perhaps it was a moment of gridline misalignment expressing itself in the framing of a wall, or an instance of material tolerance revealing itself in an oversized hopper. My recordings, like any, had a lumpy resolution that wobbled at the edges. From details measured, photographed, WhatsApped, forgotten and then misremembered, the drawings were then drafted onto standard sheets of A3 cartridge paper in varying axonometric projections.
Duncan and I quickly agreed, without much discussion, to omit drawings in plan, section or perspective. I think, in part, I had Choisy in mind. His close reading of structure and material, and of course, his classic axonometrics which reveal the spatial consequences of construction, felt fitting. However, without Choisy’s shadows,[3] axonometric drawing possesses a fundamental ambiguity, what Yve-Alain Bois termed its ‘radical reversibility’.[4] In other words, by allowing the eye to move freely between the concave and convex view, axonometry ‘abolishes’ the fixed viewpoint of perspective.[5] This uncertainty, though never fully resolved in the drawings, stops short of the ambivalence, or ‘fourth dimensionality’ of, say, Josef Albers or El Lissitzky. Regardless, the choice of axonometric projection seemed apt for a project of such murky provenance: a system that can sustain multiple viewpoints simultaneously whilst still maintaining a degree of indeterminacy.


When I first arrived at Oficina, anything physically not screwed down was subject to change. Large chunks of the project remained in flux, suspended somewhere between Duncan’s sketchbooks and the remaining enthusiasms of its dedicated builders. The drawings, as incomplete surveys of a building site under construction, describe the still ongoing results of such a process. In general, the conditions from which buildings emerge, and the snakes-and-ladders stories of their construction, are hard to read in their drawings. The matter-of-factness of drawing conventions projects a fiction of neutrality, a purported (and, indeed, useful) completeness. Yet, once these conventions are left behind, a fuzzier outlook becomes possible, one in which, with concentration, a building still in the process of becoming legible can be glimpsed.
Notes
- A site section showing critical levels for thresholds and drainage.
- Whilst some of this piece is written in the first person, it is written by both authors in collaboration. Oficina is a work by Duncan Blackmore and the drawings are by Michael Becker. Yet one is not without the other; their authorship is more linked than separate.
- Francesca Hughes, The Architecture of Error (Cambridge: MIT Press, 2014).
- Yve Alain-Bois, ‘Metamorphoses of Axonometry’, in Daidalos, no.1 (September 1981), 40–58 (42). In the same paragraph, Alain-Bois quotes Mathematician Jules de la Gournerie, who writes, ‘When a view includes shadows there can be no doubts.’
- Yve Alain-Bois, ‘El Lissitzky: Radical Reversibility’, in Art in America, vol. 76, no. 4 (April 1988), 160–181.
- ‘We saw that the surface of the Proun ceases to be a picture and turns into a structure round which we must circle, looking at it from all sides, peering down from above, investigating from below.’ Quote from El Lissitzky, ‘Proun: Not World Visions, BUT – World Reality’, in El Lissitzky–Life, Letters, Texts, ed. by Sophie Lissitzky-Küppers (London: Thames and Hudson, 1968), 343.
*
Michael Becker studied architecture at the University of Edinburgh. His work was awarded the Sergeant Award for Excellence in Drawing and a commendation for the RIBA Bronze Medal. He likes making, mistakes and drawing.
Duncan Blackmore, practising as Arrant Industries, operates in a variety of roles in relation to the built environment. His work encompasses design, creative investment, experimental urbanism and small-scale development, and extends to an engagement in conceptual, spatial and material practice.
This text is one of the selected responses to the second category of the Open Call 2025: Visibility, and the Unseen—a series of short contributions that either bring to the surface the unseen drawings within the Drawing Matter Collection (I. In the Archive) or explore original architectural drawings, created by the author(s) of the contribution, which make visible the unseen (II. In Practice).